TitleProduct

Hot Stamping Machine for ABS Fridge Profiles

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2018-11-28 13:38

  • Browse the number:

    101

Send an inquiries
+
Wuxi Yuda Light Industry Machinery Factory
Contactaixin:

ydqgjx(Mr.)  

Email:

telephone:

phone:

Arrea:

Jiangsu

Address:

No.100, East of Chunsun Road, Xishan District, Wuxi City, Jiangsu Province

Website:

http://www.cnyudajixie.com/ http://ydqgjx.xywj-cn.com/

+

Description of hot stamping machine for abs fridge profiles



 


Wuxi Yuda Light Industry Machinery Factory

Wuxi, China


Part 1. Application:

☆ This OTR100 Model hot stamping machine is special designed for decorating various PVC/PS/WPC/ABS/PVC foaming small profiles within 100mm widths; Now it is special used to decorating imitation marble stone profiles;

☆ Normally for PVC marble profiles, there have 5-9surfaces, so we always match 10sets of online hot stamping machine to get complete marble designs;

☆ For PS picture frame, it also need match 5-10sets, some for embossing, some for hot stamping, that will depended on the designs.

☆ It is installed on the extrusion line, before Haul-off machine and after calibration table;

☆ The center height of machine is 1000mm per center height of extrusion line.


 

 


Part2. The technical parameter of machine:

Items

Technical Parameters

OTR100 Type Hot Stamping Machine

Max width of thermoprinting

100mm

Max transmitting width

300mm

The speed of thermoprinting 

1—10 m/min ( adjustable)

Thickness of panels 

5—100 mm

Transmission power 

0.12 KW(with timing motor)

heating power 

1.5KW by stainless steel heating loop

The total power 

1.55 KW

Power source 

380V, 50 Hz

Total weight 

380Kg

Center height

1000mm

Visual sizes 

(L*W*H) 750 × 750× 2000 mm


Part 3:  Basic assembly of OTR100

3.1) Transmitting unit

① The whole machine adopts 50*50 square tube and Q235 steel plate to weld.

② It adopts angle iron to make conveying table.

③ It adopts cast iron wrapped with nylon to make conveying wheel.

④ It adopts nylon to control the width of board.

3.2) The angle adjustment unit

① It adopts Q235 steel plate to make base-plate, clipboard and joint-plank.

② It adopts Q235 steel plate to make big circle wheel.

③ It adopts 160 hand-wheel to adjust thermoprinting angle by worm wheel and worm.

3.3) The head of stamping control unit

① It adopts Q235 steel plate to make erect plank, plank of air cylinder; and 63*150 air cylinder to control the stamping head work back and forth.

② It adopts ZL102 with the copper slipcover to make guide thimble, and 45 steel for guide pole.

③ It adopts ZL102 to make slide seat, 45 steels for slide shaft and flat steel to make index plate.

3.4) The stamping head unit

① It adopts ZL102 to make base-plate of thermoprinting which connect between slide shaft and slide seat.

② It adopts ZL102 to make heating cover and 2 stainless steel heating pump(650w/pc) for heating, the temperature is controlled by TC Panel.

It adopts 45 steels to make axle and seat of thermoprinting.

③ It adopts ZL102 wrapped with anti high temperature silicon rubber to make stamping wheel.

④ It adopts 25w gear speed-down motor to drive stamping roller by gears.

3.5) winding & unwinding unit

① It adopts 45# steel to make shaft and Q235 to make joint plate.

② It adopts organic glass to make clamp for clamping film and aluminum loop to make fixed components.

③ It adopts 25w electronic timing gear speed-down motor to drive winding shaft by gears.

④ It adopts Q235 to make joint plate and 45# light&round steel to make shaft of guiding film.

3.6)  Electric control unit

① It adopts cold rolled steel to make electric container.

② The electric components of equipment adopts famous brand in home market.

 

Part 4. Flow chart of OTR100


Part 5. Payment and Delivery time

1) Delivery time: Approx. 40days from receipt of down payment.

2) Payment: 30% advance payment with order by T/T;

70% balance payment paid before shipment by T/T.

3) Guarantee: the machine is under warranty for one year, but not including the artificial wrong operation.

4) Assembling works: Machine can be installed and start up will be done by our technician at your workshop. This period will not exceed 5 days including the training of your 2 people. For this service a round trip airplane ticket (economy class) and accommodation& food expenses of our technician will be borne by you, and offer 50USD/day as technical subsidy for our technician.


http://www.cnyudajixie.com/